Barrett Group UK was awarded a vital piece of infrastructure to the Sheffield area for Carillion PLC.
The initial contract was to carry out all demolition, excavation, reinforced concrete works and brickwork to a 500mtr long flood wall. The Group supplied all engineering, labour, plant, temporary and materials to carry out the contracted works which began late September 2015
![]() | ![]() | ![]() |
---|