Barrett Group UK was awarded a vital piece of infrastructure to the Sheffield area for Carillion PLC.

 

The initial contract was  to carry out all demolition, excavation, reinforced concrete works and brickwork to a 500mtr long flood wall. The Group supplied all engineering, labour, plant, temporary and materials to carry out  the contracted works which  began late September 2015