This was a highly anticipated project for Carillion in the center of Leeds for Network Rail which the Barrett Group was proud to facilitate from August 2014.
The contracted works over water were off pontoons and constructed platforms supplied from RMDK were then attached to the precast units in the water. From this point 2 heavily reinforced concrete piers were constructed to carry the steelwork for the main structure.