On March 2013 British Pipeline Agency Limited (BPA) began one of its biggest projects in 30 years – Buncefield Aviation Storage Terminal Rebuild Project, after its destruction in the 2005 fire.

The project involved the detailed design and construction of 8 tanks totalling some 65,000m3 of fuel storage and all associated pumping terminal and control facilities, to re-instate Buncefield Terminal to its strategic role of supplying aviation fuel to Heathrow and Gatwick airports.

 

There was a significant quantity of heavily reinforced concrete bases with secondary and tertiary walls to 2 areas, which had concrete slabs and roadways within and in conjunction with various other structures such as culverts, slipways and roadways

Barrett Group Uk Ltd

Sixth Avenue 

Flixborough Industrial Estate 

Scunthorpe

North Lincolnshire

DN15 8SH

Office: 01724 845868  | 01724 847542  

Fax: 01724 888 777   

Email: info@barrettgroupuk.co.uk

© Copyright Barrett Group Ltd
  • LinkedIn
bottom of page